Home > Solutions > Project Diary
Railroad Simulation Implementation
Project Image The primary objective for Simulation Implementation project was to develop the simulation environment imitating different railroad objects for testing of a heavy rail Computer-Aided Dispatching system and for dispatcher training. Railroad objects being simulated included moving trains, field equipment such as signal lamps, switches, tracks, and various devices which can be controlled or commanded by the user or system. One of the special features developed was an internal clock that can either accelerate or decelerate time allowing greater control over the simulation environment.